- Isolation and removal of redundant high voltage powerlines and
- poles.
- Modifications to existing HV poles.
- Temporary generators to critical submersible dewatering bores.
- Additional distribution boards and transfer switches.
- Relocation of existing heavy vehicle standpipe and relevant infrastructure
- Isolations, monitoring and operation of ex-pit dewatering bore skids and turkeys nest flow monitoring stations.
- Replace three new HV power poles.