- Design, fabricate and install steel piping and structural steel
- Supply and install suction and discharge piping to three new transfer pumps,
- two new inlet pipes and two suction lines
- Tie into existing raw water supply pipeline including supply and installation of pressure relief lines
- Install all piping and instrumentation including stilling well and level measurement
- All structural works including supply and install of concrete footings / slabs
- for outdoor MCC and pump station
- Detailed design of transfer pumps, kiosk substation and design and
- fabrication of Outdoor Motor Control Centre and all cabling and cable infrastructure
- Total cut of 14,000m3 and fill 17,000m3 for project