HD1 South Transfer Pit and Pump Station

Project Scope

All civil, mechanical and electrical LV/HV works for the construction of a 160m x 50m transfer pond.

Location

Iron Ore Mine Site, Pilbara WA

Project Overview

  • Design, fabricate and install steel piping and structural steel
  • Supply and install suction and discharge piping to three new transfer pumps,
  • two new inlet pipes and two suction lines
  • Tie into existing raw water supply pipeline including supply and installation of pressure relief lines
  • Install all piping and instrumentation including stilling well and level measurement
  • All structural works including supply and install of concrete footings / slabs
  • for outdoor MCC and pump station
  • Detailed design of transfer pumps, kiosk substation and design and
  • fabrication of Outdoor Motor Control Centre and all cabling and cable infrastructure
  • Total cut of 14,000m3 and fill 17,000m3 for project

Project image gallery