Design and construction of:
- 33kV power pole modifications.
- 33kV underground cable and pit installations.
- 33kV to 415V 1MVA transformer kiosk.
- MCC with 300kW VSDs, L&SP, Control PLC, Internal aircon.
- 3 x 300kW motors and pumps feeding main pipeline.
- 1 x 18.5kW motors and pump feeding stand-pipe.
- Cable ladder installations above head height with waterfalls.
Project Instrumentation included flow meters, level sensors, pressure sensors and flow switches
Scope included full commissioning of instrumentation and control system and handover to client