- 415v mains supply feed from power pole transformer.
- MCC installation and commissioning.
- 2 x 150kW motors and pumps for water stand-pipe.
- 2 x “break back” light poles with concrete foundations, cage and rag bolts.
- 120m of cable ladder complete with concrete & steel support structures.
Control system and instrumentation included ultrasonic level sensors, flow meters, pressure sensors, PLC and SCADA integration
Scope included full commissioning and handover to client