Design and construction of:
- Complex combined services trenching and pits
- Pump stations complete with 220kW motors fed from Sub Station VSDs.
- Instrumentation and control systems.
- Fire container.
- Complex cable ladder system.
- Potable water RO and chlorination system.
- 17 x Bore pump and trailer generators and SCADA integration.
- 6 x 18m light poles.
- Multiple concrete support footings and structures.
Total of 23km of power, control and instrumentation cable installed