WACD Electrical Infrastructure for Water Supply Project

Project Scope

Pump Station construction

Location

Iron Ore Mine Site, Pilbara WA

Project Overview

Design and construction of:

  • Complex combined services trenching and pits
  • Pump stations complete with 220kW motors fed from Sub Station VSDs.
  • Instrumentation and control systems.
  • Fire container.
  • Complex cable ladder system.
  • Potable water RO and chlorination system.
  • 17 x Bore pump and trailer generators and SCADA integration.
  • 6 x 18m light poles.
  • Multiple concrete support footings and structures.

Total of 23km of power, control and instrumentation cable installed

Project image gallery

Ready to Start Your Next Project with ADENCO?

Using delivery models including Early Contractor Involvement (ECI), Engineering, Procurement & Construction (EPC) and Hard Dollar (HD), ADENCO applies critical thinking and engineering expertise and turns constraints into catalysts for innovation.