WACD Water Infrastructure Project

Project Scope

Design and Construction of Water Supply project

Location

Iron Ore Mine Site, Pilbara WA

Project Overview

Design and construction of:

  • fire water system including containerised pumps and two storage tanks
  • potable water system, including a treatment unit and two storage tanks

Construction of:

  • new pit surface dewatering system including two new skid mounted pumps
  • new pit bore dewatering system including eight new bore pump assemblies
  • process water system including a transfer pipe main and five water pumps
  • surplus water system including an 8km transfer pipe main
  • water supply tie-in pipeline, including tie-ins to the existing pipe network
  • new heavy vehicle water cart fill station
  • new light vehicle water cart fill station
  • All testing and commissioning works to verify the system

Total of 59km of HDPE piping and 23km of power, control and instrumentation cable installed

Project image gallery

Ready to Start Your Next Project with ADENCO?

Using delivery models including Early Contractor Involvement (ECI), Engineering, Procurement & Construction (EPC) and Hard Dollar (HD), ADENCO applies critical thinking and engineering expertise and turns constraints into catalysts for innovation.