Non-Process Infrastructure (NPI)

Newman Water Treatment Plant

Iron Ore Mine Site
Pilbara WA
Newman Water Treatment Plant
SCOPE

Install of 7km of DN355 PN12.5 Reject Discharge Main Pipeline at MT Whaleback

Description

Supply of all labour, plant, equipment and supervision to complete the install of 7km of DN355 PN12.5 Pipeline at MT Whaleback for UON / BHP. The works also included survey works, the installation of 340m of DN560 black polyethylene pipe for trenched road crossing sleeves, installation of fittings and valves, trenchless horizontal directional drilling beneath a roadway, railway and gas main with all associated civil works. The works were carried out over a 6 week period where both safety and quality exceeded the Client's expectations.

Testimonial

"Well done and thanks to the ADENCO field team. You have delivered a quality job without hurting anyone. Please pass on my thanks to the guys in the field for their endeavour. It was evident throughout the works that they are a team with a good safety culture and they displayed this by keeping their mates safe throughout the works.

Congratulations on the completion of the SOW. Take care and please keep up the zero harm mindset"

Regards,

Peter Pollard
Project Engineer, Sustaining Capital
BHP Billiton

Project Gallery